CYCLADES INTERCONNECTION 2nd PHASE – GIS NAXOS

GIS NAXOS

Customer

IPTO (Independent Power Transmission Operator)

Role

ELECTROMEC SA – NARI Group Corporation Consortium EPC contractor

Construction Period

2018 – 2020

Project Budget

9.850.000,00 €

Scope of Work

EPC construction of GIS Substation for the interconnection of Naxos island to Hellenic Electricity Transmission System as part of the 2nd Phase of Cyclades interconnection. The electrical interconnection of Naxos includes the construction of an ultramodern Gas Insulated Substation (GIS) and the closure of the loop between Paros, Naxos and Mykonos. Upon completion of the project, a double supply is provided to these islands and their uninterrupted supply is ensured even in case of loss of one of the cables.

10 SMALL WIND TURBINE FARMS (PSARA)

10 mikra aiolika

Customer

PPC Renewables SA​

Role

J/V ELECTROMEC – NOSTIRA is the general contractor

Construction Period

2018 – 2019

Project Budget

6.000.000€

Scope of Work
EPC construction of 10 wind parks, 20MW
ELECTROMEC participates as J/V leader with a percentage of 50%

CABLE INSTALLATION 150kV – KAFIREAS

ΕΓΚΑΤΑΣΤΑΣΗ ΚΑΛΩΔΙΩΝ 150kV - ΚΑΦΗΡΕΑΣ

Project Owner

Wind Parks ANATOLI – PRINIAS SA
(General Contractor is ENEL)

Construction Period

2017 – 2019

Project Budget

1.140.000€

Notes
Single power line of 9.000 m

EXTRA HIGH VOLTAGE CENTER – THISVIS

ΚΥΤ ΘΙΣΒΗΣ

Customer

LAVEL SA

Role

ELECTROMEC SA as general contractor

Construction Period

2018 

Project Budget

1.200.000€

Scope of Work

E/M extension works in existing S/S
Civil and Electrical Studies

MYKONOS PORT

ΛΙΜΑΝΙ ΜΥΚΟΝΟΥ

Project Owner

Independent Power Transmission Operator of Greece (IPTO or ADMIE)
(General contractor is Hellenic Cables))

Construction Period

2015 – 2018

Project Budget

600.000€

Notes

Separate power lines of 3.600m total length .

CABLE INSTALLATION 150kV – CYCLADES

ΕΓΚΑΤΑΣΤΑΣΗ ΚΑΛΩΔΙΩΝ 150kV -ΚΥΚΛΑΔΕΣ

Project Owner

Independent Power Transmission Operator of Greece (IPTO or ADMIE)
(General contractor is Hellenic Cables)

Construction Period

2015 – 2018

Project Budget

600.000€

Notes

Separate power lines of 3.600m total length .

GIS PARADEISI / EVIA 6

GIS ΠΑΡΑΔΕΙΣΙ

Customer

Aioliki Evias Pyrgos SA

Role

ELECTROMEC SA as general contractor

Construction Period

2018 – 2019

Project Budget

2.752.000€

Scope of Work

Civil and Electrical erection
Turn key erection of 150KV GIS Substation.
Commissioning and StartUp.

GIS SOUTH RHODES

GIS ΝΟΤΙΑ ΡΟΔΟΣ

Customer

Public Power Corporation SA

Role

ELECTROMEC SA as S/S subcontractor for TERNA SA

Construction Period

2016 – 2017

Project Budget

1.630.000€

Scope of Work

Electrical works
GiS Substation. BMS – Automation – LV – MV – HV
Commissioning and StartUp.