CYCLADES INTERCONNECTION 2nd PHASE – GIS NAXOS

GIS NAXOS

Customer

IPTO (Independent Power Transmission Operator)

Role

ELECTROMEC SA – NARI Group Corporation Consortium EPC contractor

Construction Period

2018 – 2020

Project Budget

9.850.000,00 €

Scope of Work

EPC construction of GIS Substation for the interconnection of Naxos island to Hellenic Electricity Transmission System as part of the 2nd Phase of Cyclades interconnection. The electrical interconnection of Naxos includes the construction of an ultramodern Gas Insulated Substation (GIS) and the closure of the loop between Paros, Naxos and Mykonos. Upon completion of the project, a double supply is provided to these islands and their uninterrupted supply is ensured even in case of loss of one of the cables.